|
|
2/3/06 - Kitchen before renovation.
|
|
|
2/4/06 - Another shot before renovation.
|
|
|
The proposed kitchen layout.
|
|
|
3/11/06 - The contents of old cabinets had to be temporarily stored in any available space.
|
|
|
3/11/06 - Mix of old & new cabinets, appliances and stuff scattered about.
|
|
|
|
3/11/06 - The old cabinets have been removed.
|
|
|
3/11/06 - Preparing for new cabinets.
|
|
|
3/11/06 - The lower units are set in place.
|
|
|
3/11/06 - Cabinet for the dual oven.
|
|
|
4/11/06 - Corner units have been hung.
|
|
|
|
4/11/06 - Framing prepared for the dishwashers.
|
|
|
4/11/06 - View down the front wall.
|
|
|
4/11/06 - Upper cabinets and hood in place.
|
|
|
4/13/06 - Great progress at this point, but still a ways to go.
|
|
|
4/21/06 - The new kitchen cabinets look great.
|
|
|
|
4/21/06 - Staging area for tools and stuff. Al knows where everything is.
|
|
|
4/21/06 - Note new couch, newly painted walls and partially painted ceiling.
|
|
|
4/21/06 - Anybody need an electric stove top?
|
|
|
4/21/06 - Al has been spending an awful lot of time up here.
|
|
|
4/21/06 - Al checks the cabinet measuement for the double oven.
|
|
|
|
4/22/06 - Scott helping Al with a new ceiling fan fixture. Al's in the attic.
|
|
|
4/22/06 - Kathy & Bernice checking the "to do" list amidst the clutter. Note the newly painted ceiling.
|
|
|
4/22/06 - Light shades rehung over the fluorescent fixtures, new valances and new bamboo window shades have been installed.
|
|
|
4/22/06 - Ditto for the back wall and windows.
|
|
|
4/22/06 - Kathy, Bernice & Colette deciding which pictures to hang.
|
|
|
|
4/29/06 - Ceiling fan is a nice addition.
|
|
|
4/29/06 - Pitching in during the clubhouse clean-up day.
|
|
|
4/29/06 - Carpet cleaning in a nearly empty room.
|
|
|
4/29/06 - Putting in the finishing touches.
|
|
|
5/1/06 - New counter tops being prepared.
|
|
|
|
5/1/06 - Counter tops ready for installation.
|
|
|
5/1/06 - Installation of counter tops.
|
|
|
5/1/06 - Counter tops in place.
|
|
|
5/1/06 2132 - Working into the night, 5 1/2 days before Commissioning Day.
|
|
|
5/2/06 - Stove and double oven installed.
|
|
|
|
5/2/06 - Dishwashers installed and sink is being installed.
|
|
|
5/7/06 - Commissioning Day morning, the finished product. Great job!!
|
|
|
5/7/06 - Commissioning Day tables decorated and ready.
|
|
|
5/7/06 - Fully dressed, looks terrific doesn't it????
|
|
|